Cisco Catalyst Switching
Wired monitoring overview
Switch health, uplink state and environmental indicators for Cisco Catalyst campus environments, including fabric and non-fabric deployments.
Switches online
39/40
Uplinks down
2
Operational status
Stable
Platform notes
- Track switch operational state
- Review uplink degradation or outages
- Monitor CPU, memory and environmental state
- Extend later with port-level drilldown
Top switches
| Name | Site | Status | CPU | Memory | Temperature |
|---|---|---|---|---|---|
| ams-sw-dnb-01 | De Nederlandse Bank - HQ | DEGRADED | 82% | 76% | 49 °C |
| rtt-sw-rwg-02 | Rotterdam World Gateway - HQ | HEALTHY | 34% | 52% | 38 °C |
| hrst-sw-dd-01 | Dendron School - Main building | WARNING | 63% | 79% | 43 °C |